Utility-scale Renewable Energy: Federal Policy, Provincial Priorities and Implementation Gaps
- Bankable provincial project pipelines and renewable energy corridors ought to be prepared before auctions, with transmission and grid modernisation prioritised so that new plants are not stranded. Provinces need to be active partners that manage land, permits and community relations, with the finance and institutional support required to prepare utility-scale sites.
- Utility-scale projects must be made bankable and commercially viable through payment security for new power purchase agreements, a binding roadmap for the Competitive Trading Bilateral Contract Market, and concessional finance, green sukuk, green, social and sustainability bonds and blended finance.
- Article 157 of the Constitution allows provinces to build power plants, grid stations and transmission lines within their territory and to set distribution tariffs, with disputes referred to the Council of Common Interests. Federal and provincial governments ought to use this framework to plan joint renewable energy programmes, strengthen coordination through the Council and clarify who finances, plans and sequences transmission.
- Provinces need a greater role in energy policy, generation and storage that reflects their own resources and priorities, since policy is made centrally but delivered locally. They should also take more responsibility for closing energy gaps.
- Energy planning ought to integrate utility-scale and distributed generation, since the grid was built for one-way flows from thermal plants. Utility-scale solar needs to be part of national economic and energy policy, linked with rooftop solar in a shared framework and feeding large volumes of clean power into the grid.
- Consumers without rooftop solar must also benefit from affordable utility-scale clean electricity, rather than bearing a growing share of the grid’s fixed costs. Electricity needs to become cheaper and more accessible, supported by storage, smart grids and a just transition for affected workers and regions.
- The transition must be equitable across regions. Balochistan generates more electricity than it consumes yet faces load shedding, rural areas suffer more outages than cities, and local communities near wind and solar plants in Sindh ought to share in the benefits.
- Distribution infrastructure, including poles, transformers and wires, needs urgent upgrading so that the grid can carry large volumes of renewable power.
- Solarisation of agriculture ought to be encouraged, and loans made available to households to buy solar panels and batteries. Mini-grids and off-grid solutions can serve remote communities, and solar charging stations for vehicles should be established.
- Metering arrangements for rooftop solar users need to be reviewed and their problems resolved, including the option of restoring net metering, which was replaced by net billing for new users in 2026.
- The necessary policies largely exist. What is needed is proper implementation, political will and transparency.