Daylight Saving Time and Potential of Electricity Conservation: A Case Study of Geographical and Seasonal Factors of Pakistan-6713-News

Daylight Saving Time and Potential of Electricity Conservation: A Case Study of Geographical and Seasonal Factors of Pakistan-6713-News-SDPI

SDPI twitter

Blogs


Daylight Saving Time and Potential of Electricity Conservation: A Case Study of Geographical and Seasonal Factors of Pakistan

Abstract

This study assesses the potential of electricity conservation due to daylight saving time (DST) for the case of Pakistan by analyzing various geographical and seasonal factors connected with the working mechanism of DST. Graphical analysis of these factor has been employed in order to calculate potential benefits of DST. The analysis shows geographical location of Pakistan is suitable for DST implementation in Pakistan. The estimates of this study indicate electricity saving of 640 Megawatts. This potential conservation can save up to RS 3.5Billion. 

© 2025 SDPI. All Rights Reserved Design & Developed by NKMIS WEB Unit